66,000 sqm: Terminal with Ground + 3 Floors and 8 air bridges
3 Million passengers per year
Cost approximately 250 Million USD.
The new terminal building elevated Baku Airport to world’s first class airport and introduce Azerbaijan to the wider world. Delivered the Full design Packages within a agreed short period of time including architectural management later on Site. Wood Bagot was the main Consultant, Worked for Woods Bagot Middle East